Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/category/ads/ | |||
Project Name | North and Central Electrical Distribution Phase 1 | |||
Prequalifying for | North Carolina State University is seeking qualification
statements from general contractors for improvements for the
North & Central Electrical Distribution Phase 1 project,
located on central campus precinct. The project scope
includes:
Phase 1 will replace the existing Sullivan Substation
secondary bus 1 with new metalclad switchgear, modify
existing bank 2 secondary switchgear to add additional
circuit breakers, add additional SCADA hardware and points
to the existing system, install distribution ductbank,
transfer circuits and demolish the existing overhead bus. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | Burns & McDonnell | |||
Design Firm Contact Name | Mike Dempsey | |||
Design Firm Telephone Number | (817) 840-1235 | |||
Design Firm Email | mdempsey@burnsmcd.com | |||
CM at Risk Firm Name | ||||
CM at Risk Firm Email | dllallat@ncsu.edu | |||
Campus Contact Email | dllallat@ncsu.edu | |||
Due Date | 03/23/2017 | |||
Due Time | 5:00 pm | |||
Submit To | Damian Lallathin
Project Manager
NC State University
Capital Project Management
Administrative Services Building III
2701 Sullivan Dr., Suite 331
Campus Box 7520
Raleigh, NC 27695-7520 |