Opportunities to Do Business with the Universities

Designer Solicitations

Full Details

 Institution NC Central University 
 Institution URL for Additional
Information about this Project (Optional)
 https://www.nccu.edu/facilities-projects/okelly-riddick-stadium-turf-replacement 
 Project Name O'Kelly-Riddick Stadium Turf Replacement 
 Type of Services Engineering 
 Project Manager Joshua Frey 
 Phone Number (919) 475-1456 
 Contact Email jfrey@nccu.edu 
 Closing Date 04/03/2023 
 Project Budget 
$1,825,588
 
 Project Description One-Two Sentences
The artificial turf field in the O'Kelly-Riddick Stadium has reach the end of its useful life due to UV damage and the improper drainage as originally installed in 2008. Most artificial turf fields are expected to have a useful life of about 8 years. This project is for the advanced planning stage for a complete replacement of the 83,000 square foot artificial turf field and connection of drains to the existing campus storm water drainage system. Preproposal conference will be held on Monday, March 27th at 2pm in the Hubbard-Totten Building Rm 112 at 1801 Fayetteville St, Durham NC 27707. Current project authorization is for advance planning only. The selected firm may be retained through full design and construction at the university's option.
 
 Submit Letters of Interest
and Current SF-330 to:
 (Contact Person, Name of Institution & Address)
Joshua M Frey North Carolina Central University Hubbard-Totten Building Room 126D 1801 Fayetteville St Durham, NC 27707
 

In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.