Opportunities to Do Business with the Universities

Designer Solicitations

Full Details

 Institution UNC Pembroke 
 Institution URL for Additional
Information about this Project (Optional)
 https://www.uncp.edu/resources/facilities-planning-and-construction/information-designers 
 Project Name Fire Alarm Control Panels (Jones, Livermore, Lumbee, Old Main) 
 Type of Services Architectural/Engineering 
 Project Manager Bobby Locklear 
 Phone Number  
 Contact Email bobby.locklear@uncp.edu 
 Closing Date 03/14/2023 
 Project Budget 
$782,000
 
 Project Description One-Two Sentences
The University of North Carolina at Pembroke (UNCP) is seeking letters of interest from qualified professionals to provide complete design and construction administration services for UNCP to replace Fire Alarm Control Panels (FACP) and all system devices in the following locations; Lumbee Hall, Livermore Library, Jones Health & PE Facility and Old Main. These systems are comprised of both addressable and non-addressable systems. All systems have annunciators, duct detectors, heat detectors, smoke detectors, audible / visual devices, pull stations, remote power supplies and back up battery systems. All systems are to be replaced with modern, addressable systems and all devices on the system are to be replaced upgrading the fire alarm control panel in Lumbee Hall, Livermore Library, Jones Health & PE Facility and Old Main buildings. Firms are requested to assure receipt of proposals at address listed below by 12:00 p.m. on 2023-03-14. Intended Schedule as follows: 2/28/2023 - Pre-Submittal Meeting virtual via WebEx (info URL) 3/14/2023 - Letters of Interest Due To maintain impartiality in the selection process, from the date of this public announcement, do not communicate with members of the Board of Trustees, Campus Officials, or staff, except for the specified project contact. Any breach of this directive or communication with anyone else may result in the rejection of your submission. Therefore, all correspondence should be through email only, sent to the project contact, and include copies to Mark.Vesely@uncp.edu, Director of Operations and Maintenance, and Douglas.Hall@uncp.edu, Interim Architect. This restriction remains in effect until the Board of Trustees approves the project and releases a public statement.
 
 Submit Letters of Interest
and Current SF-330 to:
 (Contact Person, Name of Institution & Address)
Bobby Locklear Project Manager UNC Pembroke Facilities Planning, Design and Construction 1 University Drive Pembroke, NC 28372
 

In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.