 Project Name Brody Building and Central Utility Plant - Electrical Renovations 
 Type of Services Electrical Engineering 
 Project Manager Nick McKinley 
 Phone Number (252) 328-6858 
 Contact Email mckinleyn@ecu.edu 
 Closing Date 06/23/2020 
 Project Budget 
$1,574,470
 
 Project Description One-Two Sentences
This project consists of: (1) Replacement (or retrofit) of two existing 2000 Amp switchboards (8S & 8N, double-ended, 1000 Amps per section) on the eighth floor of the Brody Building. The switchboards serve all seven of the elevators in the building and numerous other critical loads. (2) Replacement of existing exterior Westinghouse metal-clad, 15kV point of delivery (POD) switchgear at the Health Sciences Campus Central Utility Plant.
 
 Submit Letters of Interest
and Current SF-330 to:
 (Contact Person, Name of Institution & Address)
John G. Fields, PE Facilities Engineering and Architectural Services 1001 East Fourth Street Greenville, NC 27858
 

In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.