Opportunities to Do Business with the Universities

Designer Solicitations

Full Details

 Institution East Carolina University 
 Institution URL for Additional
Information about this Project (Optional)
  
 Project Name Steam Decentralization - Minges-Ward-Murphy Bldgs. 
 Type of Services Engineering 
 Project Manager Robert Still 
 Phone Number (252) 328-6858 
 Contact Email stillr@ecu.edu 
 Closing Date 03/27/2020 
 Project Budget 
$1,619,620
 
 Project Description One-Two Sentences
This project will remove and replace the existing steam distribution system serving the South Athletic Campus on Main Campus, with a natural gas fired condensing water boiler system to serve all heating functions for this part of campus. Also included will be the replacement of all steam to hot water generation equipment producing domestic hot water and heating hot water. The three (3) buildings involved on this part of Main Campus are: Minges Coliseum, Ward Sports Medicine Building and Murphy Center.
 
 Submit Letters of Interest
and Current SF-330 to:
 (Contact Person, Name of Institution & Address)
Robert Still Facilities Engineering & Architectural Services East Carolina University 1001 East Fourth St. Greenville, NC 27858
 

In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.