Designer Solicitations
Full Details
Institution | NC State University | |||||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/category/ads/ | |||||
Project Name | Carmichael Addition and Renovation-Special Inspections, Geotech, Materials Testing | |||||
Type of Services | Engineering | |||||
Project Manager | Carolyn Axtman | |||||
Phone Number | (919) 515-8049 | |||||
Contact Email | ccaxtman@ncsu.edu | |||||
Closing Date | 12/16/2016 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences Proposals for Special Inspections, Geotechnical, and
Materials Testing for an addition and renovation to
Carmichael Gym, built in 1961. The existing east wing,
47,000 gross square feet (GSF), will be demolished and
replaced with an addition of approximately 82,800 GSF. The
project scope includes: recreation, fitness and specialized
activity space; classroom/ multipurpose space; offices; and
a functional training area. The project will create one
controlled access point for the complex, make the second
floor of the existing gymnasium building accessible, and
install a sprinkler system and replace alarm systems
throughout the entire complex. | |||||
Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Carolyn Axtman
NC State University
Capital Project Management
Box 7520
Raleigh, NC 27695-7520 |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.