Opportunities to Do Business with the Universities

Designer Solicitations

Full Details

 Institution NC Central University 
 Institution URL for Additional
Information about this Project (Optional)
  
 Project Name Baynes Residence Hall Renovation 
 Type of Services Architectural/Engineering 
 Project Manager Tim Williams 
 Phone Number (919) 530-6824 
 Contact Email tjwilliams@nccu.edu 
 Closing Date 02/11/2016 
 Project Budget 
$3,148,600
 
 Project Description One-Two Sentences
Baynes Residence Hall is a 9-Story, 400-Bed facility built in 1966. It consists of 85,320 GSF of space. All Bedrooms are double-occupancy without private toilets. Group toilets and showers are located on each floor. The building has an antiquated two-pipe hot water, heating system with radiant heating units in each room. Window air conditioning units are located in each room, mounted in un-insulated single-hung windows. Window units in the 2nd and 3rd floor rooms are heating and cooling units, due to the limited flow of hot water in the corroded two-pipe system. The building's electrical system is outdated and requires modernization and updating to new electrical code requirements. There has not been a major renovation of the building since 1996, except for the addition of a fire suppression system in 2012. This project will consist of renovation phases outlined to major elements of the building. Phase 1 - Electrical Upgrade & HVAC Renovation Phase 2 - Window Replacement & Restroom Renovations A preproposal designers meeting will be held on Monday, February 1, 2016 at 10 am. Meet in the lobby of Baynes Hall.
 
 Submit Letters of Interest
and Current SF-330 to:
 (Contact Person, Name of Institution & Address)
Tim Williams North Carolina Central University 1801 Fayetteville St Hubbard Totton Bldg. RM 118B Durham, NC 27707
 

In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.