Opportunities to Do Business with the Universities

Construction Manager-at-Risk Solicitations

Full Details

 Institution UNC School of the Arts 
 Institution URL for Additional
Information about this Project (Optional)
 https://www.uncsa.edu/mysa/faculty-staff/around-campus/facilities-maintenance/design-and-construction-projects/index.aspx 
 Project Name Stevens Center Renovation Phase 1 and Water Intrusion, Building Envelope, HVAC and Fire Suppression 
 Project Manager Krissy Ferguson 
 Phone Number (901) 651-8864 
 Contact Email krissy@riethjones.com 
 Pre-proposal Date 06/15/2022 
 Pre-proposal Time 2:00 pm 
 Pre-proposal Location Electronic submittal 
 Closing Date 06/24/2022 
 Project Budget 
$29,800,000
 
 Project Description One-Two Sentences
UNC School of the Arts (UNCSA) is accepting proposals for a Construction Manager at Risk for the Stevens Center Renovations - Phase 1 Project until 5:00 pm on Thursday June 24, 2022 via Electronic submission. All responses should be delivered electronically in PDF format via email to W. Steve Martin at martinw@uncsa.edu and Krissy Ferguson at krissy@riethjones.com Hard copies are not required for this solicitation. This project is for a comprehensive renovation to the historic Stevens Center Performing Arts Center in downtown Winston-Salem. The work will include historic preservation of the building's 1929 facade, transformation of the main lobby, possible expansion of the stage and back of house facilities, enlargement and reconfiguration of the orchestra pit, renovation of the event space on top floor, enhanced IT technology and addressing accessibility. The selected Construction Manager at Risk (CMR) firm will work closely with the Architects and Engineers to provide a construction perspective and expertise to the design process. The work of the CMR will be performed in two phases under separate contracts for each phase. Phase 1 will include the pre-construction phase services and the preparation and submission of the Guaranteed Maximum Price (GMP) ensuring the work can be accomplished within the approximate $23.4 million hard cost and $29.8 million total project. Preconstruction services will include, but not be limited to cost estimating, life-cycle cost analyses, building type/method cost analyses, phasing and sequencing analyses, schedule development, value-engineering, BIM driven conflict resolution, constructability reviews, etc.
 
 Submit To 
W.Steve Martin, RA Associate Vice Chancellor for Facilities Management martinw@uncsa.edu and Krissy Ferguson krissy@riethjones.com