| Bidding from prequalified firms on | | Holt Brothers Construction is seeking bids from
prequalified trade and specialty contractors for the
following bid packages:
BP-01A General Trades & Temporary
Fencing, BP-07A Waterproofing &
Caulking, BP-14A Elevators,
BP-01B Final Cleaning, BP-08A Doors, Frames, Hardware,
Toilet Accessories & Fire Extinguisher
Cabinets, BP-21A Fire Suppression Systems,
BP-02A Demolition, BP-08B Storefronts & Interior
Glazing, BP-23A Plumbing & HVAC,
BP-03A Concrete, BP-08C Exterior Windows, BP-26A Electrical,
Low Voltage & Fire Alarm,
BP-04A Masonry, BP-09A Drywall &
Ceilings, BP-32A Sitework,
BP-05A Structural Steel & Miscellaneous
Metals, BP-09B Flooring & Accesories,
BP-06A Millwork, BP-09C Painting
Holt Brothers Construction will host an open pre-bid meeting
to review final bidding instructions on June 26, 2019 at
4:00 PM at the NC State University Admin III Building, Room
301, 2701 Sullivan Drive, Raleigh NC. A site tour will
follow the pre-bid meeting. All interested bidders are
advised to attend.
Preferred Brand Alternates Meeting -
Holt Brothers Construction will host a preferred brand
alternates meeting on June 26, 2019 at 3:30 PM at the NC
State University Admin III Building, Room 301, 2701 Sullivan
Drive, Raleigh NC.
The following preferred alternate items will be considered:
#P-1 Domestic water meter by Neptune compound
#M-1 Schneider Eectric Invensys HVAC
#M-2 Johnson Controls Metasys Controls System
#M-3 Steam Meter by Veris Accelabar, differential pressure
floe meter
#E-1 Electric Meter by Nexus 1262
#A-1 Door Hardware (Closers-LCN4010/4111), (Exit Devices-Von
Duprin 98 Series), (Locks and Latches-Best 45H Series or
Schlage L9000 Series), (Low energy Power Operators-LCN 4642
Series)
Bidding
Please contact Megan Beach, Project Manager, at
mbeach@holtbrothersinc.com for access to bid documents.
Sealed bid proposals are due by 3:00 PM on July 11, 2019 at
the NC State University Admin III Building, Room 301, 2701
Sullivan Drive, Raleigh NC. | |