| Bidding from prequalified firms on | | Holder Construction Company is accepting bids for the NC
State DH Hill Library Academic Success Center project from
the approved list of prequalified subcontractors contained
herein. Information/dates regarding the pre-bid meeting, bid
opening, contract documents, and deadlines are as follows:
Pre-Bid:
A pre-bid meeting was held at 1:00PM on April 23, 2019 at
the Witherspoon Student Center, Room 126 (Washington Sankofa
Room) at the North Carolina State University in Raleigh.
Preferred Alternates:
A Preferred Alternate Review meeting was held at 12:30PM on
April 23, 2019 at the Witherspoon Student Center, Room 126
(Washington Sankofa Room) at the North Carolina State
University in Raleigh.
RFIs:
RFIs will not be accepted prior to the Re-Bid Opening.
Re-Bid Opening:
Sealed proposals will be received from prequalified
subcontractors until 1:00 pm on June 13, 2019 in the
Administrative Services Building III, Room 101. All
proposals shall be lump sum. Bids not hand delivered must
be received no later than 11AM EST on June 13, 2019 to the
following: Matthew Boeggeman, 207 Church at North Hills
Street, Raleigh, NC 27609.
Proposals will be accepted only from pre-qualified
contractors for the following packages:
08C Interior Glass
*Note: Subcontractors may only submit pricing for the
package(s) for which they are prequalified.
HUB Participation:
Holder Construction Company is seeking participation from NC
State HUB certified companies for this project. Holder is
committed to providing the opportunity to HUB certified
firms (through 1st and 2nd tier opportunities) to exceed the
required participation goal of 10%. Bid forms (and
guidelines) for meeting HUB participation will be required
and will be provided within the bid documents.
Bonding Requirements:
Bid bonds will be required at the time of bid. Include the
bond itself in your bid proposal. Payment and Performance
Bonds will be required for all trades. Include the cost of
these bonds (not the bonds themselves) in your proposal.
Contract Documents:
Complete plans and specifications for this project can be
obtained electronically from HELIXproject. All approved
bidders will be granted access to the site to obtain the
Request for Proposal and Contract Documents.
Once you have gained access to the project folder, please
navigate to the following location(s):
01 - Request for Proposal
02 - Contract Documents -> 190123 Demolition and General
Trades Bid Set 02 - Contract Documents -> 190410 CD Bid
Set
02 - Contract Documents -> 190506 Bid Package 2 -
Addendum 01
Complete plans, specifications and contract documents will
also be open for inspection at:
1. iSqFt
2. Duncan Parnell - 201 Glenwood Ave, Raleigh, NC 27603
3. Accent Imaging - 8121 Brownleigh Dr, Raleigh, NC, 27617
4. Dodge Projects
5. Holder Construction Company, 2359 Perimeter Pointe
Parkway, Suite 250, Charlotte, NC 28208 | |