| Institution | | UNC Greensboro | |
| Institution URL for Additional Information about this Project (Optional) | | | |
| Project Name | | HHP Cooling Tower and Chiller Replacement | |
| Name of Design Firm | | RMF Engineering, Inc. | |
| Design Firm Contact Name | | Jonathan Eveleth | |
| Design Firm Telephone Number | | (919) 941-9876 | |
| Design Firm Email | | jonathan.eveleth@rmf.com | |
| Campus Contact Email | | jwpope@uncg.edu | |
| Pre-Bid Date | | 06/18/2015 | |
| Pre-Bid Time | | 1:00 pm | |
| Bid Date | | 07/07/2015 (Date Bids Will Be Opened) | |
| Bid Time | | 2:00 pm (Time Bids Will Be Opened) | |
| Bid Location | | UNC Greensboro
Facilities Design and Construction
Gray Home Management House
105 Gray Drive
Greensboro, NC, 27412 | |
| Plan Deposit | | Complete plans and specifications may be obtained from the Designer during normal office hours. | |