Opportunities to Do Business with the Universities

Designer Solicitations

Full Details

 Institution UNC Greensboro 
 Institution URL for Additional
Information about this Project (Optional)
 https://fac.uncg.edu/wp-content/uploads/20250326_307-Tower-Vg-Elev_DesignerAd_Repost.pdf 
 Project Name Tower Village Elevator Replacement (Re-post) 
 Type of Services Architectural/Engineering 
 Project Manager Wendi Stogner 
 Phone Number (336) 608-9418 
 Contact Email wcstogner@uncg.edu 
 Closing Date 04/07/2025 
 Project Budget 
$950,000
 
 Project Description One-Two Sentences
The University of North Carolina at Greensboro (UNCG) is seeking qualified design professionals for the full replacement of two hydraulic elevators in Tower Village, a residence hall on campus. The existing elevators, originally installed in 1993, have reached the end of their operational lifespan and require replacement to ensure continued safety, reliability, and compliance with current building codes. This project will replace one six-stop hydraulic elevator and one seven-stop hydraulic elevator, along with necessary upgrades to related building systems. The scope of work includes securing a designer to assess the existing elevator system, determine requirements for new hydraulic elevators, and prepare detailed construction documents for contractor bidding. The project will involve the removal and disposal of the two existing elevator systems, with necessary patching and repair of affected structural elements. The new elevator installation will include modern hydraulic systems with upgraded control panels, call stations, and emergency communication systems based on the new design. The project will also evaluate the existing ventilation and cooling systems serving the elevator mechanical rooms, with replacements or enhancements made as required to meet current standards. Fire and life safety compliance will be addressed through the assessment and replacement of fire-rated doors, smoke detectors, and heat detectors as needed. The existing electrical system will be evaluated, and electrical wiring, control panels, mechanical components, and emergency lighting will be replaced where required. The project will also include upgrades to ADA-compliant guide rails and cab interiors where necessary. The project must be completed with the renovated elevators fully operational and ready for occupancy by August 1, 2026. Letters of Interest due to fdc@uncg.edu by 12:00 p.m. on April 7, 2025
 
 Submit Letters of Interest
and Current SF-330 to:
 (Contact Person, Name of Institution & Address)
Electronic submissions only to Wendi Stogner, fdc@uncg.edu; UNC Greensboro Facilities Design & Construction
 

In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.