Opportunities to Do Business with the Universities
Designer Solicitations
Full Details
| Institution | UNC Greensboro | |||||
| Institution URL for Additional Information about this Project (Optional) | https://fac.uncg.edu/wp-content/uploads/20250326_307-Tower-Vg-Elev_DesignerAd_Repost.pdf | |||||
| Project Name | Tower Village Elevator Replacement (Re-post) | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Wendi Stogner | |||||
| Phone Number | (336) 608-9418 | |||||
| Contact Email | wcstogner@uncg.edu | |||||
| Closing Date | 04/07/2025 | |||||
| Project Budget |
| |||||
| Project Description | One-Two Sentences The University of North Carolina at Greensboro (UNCG) is
seeking qualified design professionals for the full
replacement of two hydraulic elevators in Tower Village, a
residence hall on campus.
The existing elevators, originally installed in 1993, have
reached the end of their operational lifespan and require
replacement to ensure continued safety, reliability, and
compliance with current building codes. This project will
replace one six-stop hydraulic elevator and one seven-stop
hydraulic elevator, along with necessary upgrades to related
building systems. The scope of work includes securing a
designer to assess the existing elevator system, determine
requirements for new hydraulic elevators, and prepare
detailed construction documents for contractor bidding. The
project will involve the removal and disposal of the two
existing elevator systems, with necessary patching and
repair of affected structural elements.
The new elevator installation will include modern hydraulic
systems with upgraded control panels, call stations, and
emergency communication systems based on the new design. The
project will also evaluate the existing ventilation and
cooling systems serving the elevator mechanical rooms, with
replacements or enhancements made as required to meet
current standards. Fire and life safety compliance will be
addressed through the assessment and replacement of
fire-rated doors, smoke detectors, and heat detectors as
needed. The existing electrical system will be evaluated,
and electrical wiring, control panels, mechanical
components, and emergency lighting will be replaced where
required. The project will also include upgrades to
ADA-compliant guide rails and cab interiors where
necessary.
The project must be completed with the renovated elevators
fully operational and ready for occupancy by August 1,
2026.
Letters of Interest due to fdc@uncg.edu by 12:00 p.m. on
April 7, 2025 | |||||
| Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Electronic submissions only to Wendi Stogner, fdc@uncg.edu;
UNC Greensboro Facilities Design & Construction |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.