| Institution | : | UNC Pembroke | |||
| Institution URL for Additional Information about this Project (Optional) | : | http://www.uncp.edu/fpc/contractors/ | |||
| Project Name | : | Taylor Track & Field Upgrades | |||
| Prequalifying for | : | Re-advertisement for Pre-Qualification
The University of North Carolina at Pembroke is seeking
qualification statements from general contractors for the
Taylor Track & Field Upgrades project. The scope of
work will consist of the repair/replacement of existing
asphalt base, repair/replacement of the existing channel
drain and the installation of new synthetic surfacing and
line markings. The scope also includes construction of a
new high jump area. Prior experience in the construction of
NCAA certified track and field projects is a requirement. | |||
| Main Contact for Submission | : | Campus Contact | |||
| Name of Design Firm | : | CHA Consulting, Inc. | |||
| Design Firm Contact Name | : | Tim Murphy | |||
| Design Firm Telephone Number | : | (919) 657-0232 | |||
| Design Firm Email | : | tmurphy@chacompanies.com | |||
| CM at Risk Firm Name | : | Not Applicable | |||
| CM at Risk Firm Email | : | Not Applicable | |||
| Campus Contact Email | : | michael.clark@uncp.edu | |||
| Due Date | : | 02/12/2013 | |||
| Due Time | : | 4:00 pm | |||
| Submit To | : | J. Michael Clark, AIA
UNC Pembroke
Facilities Planning & Construction
1 University Drive
Pembroke, NC 28372
Phone 910-521-6374
Contractors pre-qualified from the previous announcement
need not re-submit.
Please submit 2 Hard Copies to the Project Manager at the
above address. No electronic files will be accepted.
Pre-Qualification packages will not be accepted after the
due date and time.
Please request a pre-qualification package by e-mailing the
Design Firm Contact. |