 Project Name :Main Campus Electrical Duct Bank Improvements 
 Prequalifying for :
This project involves the installation of a 15kV electric duct bank in two areas on the University of North Carolina at Chapel Hill Campus. The aprroximate overall ductbank length is 450 feet. Pre-cast manholes, switch pads, and rigid conduit thru a building crawl space is also included in this project. This will qualify for the duct bank construction and associated work only; the majority of cabling, terminations, and equipment, unless otherwise specified, will be provided by the owner outside of this contract. Project Estimated Construction Budget: $750,000. Construction Schedule: Construction activities are expected to start in Summer 2013 with a duration of 60 consecutive calendar days.
 
 Main Contact for Submission :Design Firm 
 Name of Design Firm :RMF Engineering, Inc. 
 Design Firm Contact Name :Cheryl Piner, PE 
 Design Firm Telephone Number :(919) 941-9876 
 Design Firm Email :cheryl.piner@rmf.com 
 CM at Risk Firm Name : 
 CM at Risk Firm Email : 
 Campus Contact Email :mkonishi@fac.unc.edu 
 Due Date :02/27/2013 
 Due Time :3:00 pm 
 Submit To :
Applications for pre-qualification will be due no later than 3:00pm, February 27, 2013. Pre-qualification forms may be obtained by contacting Cheryl Piner, PE at RMF Engineering Inc, telephone (919)941-9876, cheryl.piner@rmf.com. Submit to: Ms. Cheryl Piner RMF Engineering, Inc. 8081 Arco Corporate Drive Suite 300 Raleigh, NC 27617