| Institution | : | NC State University | |||
| Institution URL for Additional Information about this Project (Optional) | : | www.ncsu.edu/facilities/advertisements/index.htm | |||
| Project Name | : | Scott Hall Chilled Water Connection | |||
| Prequalifying for | : | NC State University is seeking qualification statements from
general contractors for improvements to the Scott Hall
Chilled Water Connection project, located on North Campus.
The scope of work will consist of the installation of 225 LF
of new underground chilled water supply and chilled water
return piping from the main trunk lines near the brickyard
into the Scott Hall mechanical room, the removal of the
existing water cooled chiller from the Scott Hall
mechanical room, the removal of the existing cooling tower
located on the roof of Scott Hall, connection of the
existing building chilled water system to the central
campus chilled water system, and associated electrical
work.
Interested general contractors should have experience in
the installation of chilled water systems and preferably
have worked on a university campus environment. | |||
| Main Contact for Submission | : | Campus Contact | |||
| Name of Design Firm | : | Dewberry Architects Engineers Consultants | |||
| Design Firm Contact Name | : | Johnny Wood | |||
| Design Firm Telephone Number | : | (919) 881-9939 | |||
| Design Firm Email | : | jwood@dewberry.com | |||
| CM at Risk Firm Name | : | Not Applicable | |||
| CM at Risk Firm Email | : | Not Applicable | |||
| Campus Contact Email | : | srbostia@ncsu.edu | |||
| Due Date | : | 10/16/2012 | |||
| Due Time | : | 4:00 pm | |||
| Submit To | : | Steven R. Bostian, PE
NC State University
Capital Project Management
2701 Sullivan Drive - Suite 331
Raleigh, NC 27695-7520
919-515-8059
srbostia@ncsu.edu
Please contact the project manager on or after September 24
for an electronic copy of the pre-qualification submittal
package.
Please complete the package in its entirety and submit 3
hard copies of the Pre-qualification submittal package to
the project manager at the address listed above. No
electronic copies will be accepted. |