| Institution | : | UNC - Chapel Hill Academic Affairs | |||
| Institution URL for Additional Information about this Project (Optional) | : | http://fpc.unc.edu/Projects/FirmProfileLogin.aspx | |||
| Project Name | : | Main Campus Electrical Duct Bank Improvements | |||
| Prequalifying for | : | This project involves the installation of a 15kV electric
duct bank in two areas on the University of North Carolina
at Chapel Hill Campus. The aprroximate overall ductbank
length is 450 feet. Pre-cast manholes, switch pads, and
rigid conduit thru a building crawl space is also included
in this project. This will qualify for the duct bank
construction and associated work only; the majority of
cabling, terminations, and equipment, unless otherwise
specified, will be provided by the owner outside of this
contract. Project Estimated Construction Budget: $750,000.
Construction Schedule: Construction activities are
expected to start in Summer 2013 with a duration of 60
consecutive calendar days. | |||
| Main Contact for Submission | : | Design Firm | |||
| Name of Design Firm | : | RMF Engineering, Inc. | |||
| Design Firm Contact Name | : | Cheryl Piner, PE | |||
| Design Firm Telephone Number | : | (919) 941-9876 | |||
| Design Firm Email | : | cheryl.piner@rmf.com | |||
| CM at Risk Firm Name | : | ||||
| CM at Risk Firm Email | : | ||||
| Campus Contact Email | : | mkonishi@fac.unc.edu | |||
| Due Date | : | 02/27/2013 | |||
| Due Time | : | 3:00 pm | |||
| Submit To | : | Applications for pre-qualification will be due no later than
3:00pm, February 27, 2013. Pre-qualification forms may be
obtained by contacting Cheryl Piner, PE at RMF Engineering
Inc, telephone (919)941-9876, cheryl.piner@rmf.com.
Submit to:
Ms. Cheryl Piner
RMF Engineering, Inc.
8081 Arco Corporate Drive
Suite 300
Raleigh, NC 27617
|