| Institution | : | NC State University | |||||
| Institution URL for Additional Information about this Project (Optional) | : | www.ncsu.edu/facilities | |||||
| Project Name | : | Data Center II - Utility Redundancy | |||||
| Type of Services | : | Engineering/Architectural | |||||
| Project Manager | : | Bill Davis | |||||
| Phone Number | : | (919) 513-7492 | |||||
| Contact Email | : | bill_davis@ncsu.edu | |||||
| Closing Date | : | 11/08/2012 | |||||
| Project Budget | : |
| |||||
| Project Description | : | One-Two Sentences This project will provide critical utility redundancy for
the data center located within the Worsley Administrative
Complex. The data center supports university and
non-university clients, and must remain operational without
interruption. Electrical, emergency, and cooling systems
will be modified to optimize the data center capacity and
to minimize risk of single point failure. Systems will be
evaluated to isolate data center support from building
operations. Significant experience with data center
systems and risk management is required of the design team.
Options may include the addition of equipment to the
building site. A focus will be on equipment and
configurations that promote energy conservation. Current
project authorization is for advanced planning only. The
selected firm may be retained through full design and
construction at the University's option. | |||||
| Submit Letters of Interest and Current SF-330 to: | : | (Contact Person, Name of Institution & Address) Bill Davis
NC State University, Capital Project Management
Administrative Services III, Suite 369E
Raleigh, NC 27695 |