SELECTING CRITERIA (from State Building Commission)
In selecting the three firms to be presented, the pre-selection committee should take into consideration qualification information including such factors as:
- Specialized or appropriate expertise in the type of project.
- Past performance on similar projects.
- Adequate staff and proposed design or consultant team for the project.
- Current workload and State projects awarded.
- Proposed design approach for the project including design team and consultants.
- Recent experience with project costs and schedules.
- Construction administration capabilities.
- Proximity to and familiarity with the area where the project is located.
- Record of successfully completed projects without major legal or technical problems.
- Other factors which may be appropriate for the project.
UNC uses these criteria and adds HUB participation on the design team/consultants as an additional factor.
Submittal Criteria
A current SF-254 form should be submitted with the required letter of interest and information package.