 Project Name Fuel Oil Tank Expansion - Centennial Campus 
 Prequalifying for 
This project increases stand-by fuel volume via a new 37,500 gallon packaged, vertical steel fuel oil storage tank. Piping will tie into an existing pumping & control system. The fuel oil storage tank site will be graded in preparation for a containment dike and tank foundations. The Fuel oil dike will utilize a conventional soil supported foundation and be sized to accommodate placement of two tanks and spill volume of one full tank. The tanks will be supported on a thick concrete pad on grade. See above link to download prequalification package for submission.
 
 Main Contact for Submission Campus Contact 
 Name of Design Firm RMF Engineering 
 Design Firm Contact Name Jonathan Eveleth 
 Design Firm Telephone Number (919) 941-9876 
 Design Firm Email jonathan.eveleth@rmf.com 
 CM at Risk Firm Name  
 CM at Risk Firm Email  
 Campus Contact Email dllallat@ncsu.edu 
 Due Date 09/20/2018 
 Due Time 5:00 pm 
 Submit To 
Damian Lallathin, project manager, at Administrative Services Building III, 2701 Sullivan Dr., Suite 331, NCSU, Campus Box 7520, Raleigh, NC 27695-7520.