Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | http://facilities.ofa.ncsu.edu/category/ads/ | |||
Project Name | Dan Allen Parking Deck - Top Deck Repairs | |||
Prequalifying for | This project addresses water ponding and infiltration on the
top deck of the east side and west side deck sections. These
repairs include top deck resurfacing/resloping, crack
repairs, delamination/spalling repairs, the application of a
protective coating, installation of new drains and
associated piping connected to the existing drainage system,
and restriping of the parking places. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | Raymond Engineering | |||
Design Firm Contact Name | David Willers | |||
Design Firm Telephone Number | (919) 872-7866 | |||
Design Firm Email | david.willers@raymondllc.com | |||
CM at Risk Firm Name | Not Applicable | |||
CM at Risk Firm Email | Not Applicable | |||
Campus Contact Email | srbostia@ncsu.edu | |||
Due Date | 02/03/2017 | |||
Due Time | 4:30 pm | |||
Submit To | NC State University
Steven R. Bostian, P.E.
Administratives Services III Building
2701 Sullivan Drive
Raleigh, NC 27695
Application packages will be available electronically on
January 17, 2017. Please contact the NC State project
manager via email (preferred) or phone (919-515-8059) to
request a package. One (1) hard copy of the completed
qualification package must be submitted to the NC State
project manager by the due date. Completed qualification
packages will not be accepted electronically. |