Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | http://facilities.ofb.ncsu.edu/category/ads/ | |||
Project Name | Centennial Campus Thermal Utilities and Infrastructure - Chilled Water to CTI Building | |||
Prequalifying for | North Carolina State University is seeking qualification
statements from general contractors for the installation of
Chilled Water Supply and Return pipes into the Center for
Technology and Innovation on the NC State University
Centennial Campus. Specifically, the project will install
approximately 180 Linear Feet total of 30-inch diameter DIP
chilled water supply and return pipes under the pavement at
Research Drive and Main Campus Drive, approximately 108
Linear Feet total of 10-inch diameter DIP chilled water
supply and return piping under Research Drive into the CTI
building mechanical room, two 10-inch diameter butterfly
valves, two 30-inch diameter butterfly valves, approximately
285 Linear Feet total of electrical ductbank containing four
6-inch diameter conduits and two 2-inch diameter conduits
and a concrete pad. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | RMF Engineering | |||
Design Firm Contact Name | Greg Carnathan | |||
Design Firm Telephone Number | (919) 941-9876 | |||
Design Firm Email | Greg.carnathan@rmf.com | |||
CM at Risk Firm Name | N/A | |||
CM at Risk Firm Email | N/A | |||
Campus Contact Email | srbostia@ncsu.edu | |||
Due Date | 06/02/2015 | |||
Due Time | 5:00 pm | |||
Submit To | Steven R. Bostian, PE
NC State University
2701 Sullivan Drive Suite 331
Raleigh, NC 27695-7520
Pre-qualification submittal documents can be received by
emailing Steve Bostian at srbostia@ncsu.edu.
One hard copy of the pre-qualification submittal is due by
June 2, 2015 at 5 PM. Electronic copies will not be
accepted. Submittals received after 5 PM on the due date
will not be accepted.
Please see the NC State Facilities webpage, referenced
above, for further information concerning the project scope. |