| Prequalifying for | | Prequalification Proposals from Single Prime General
Contractors for the renovation of Murray Hall 1101, UNC
Chapel Hill.
All Pre-Qualification Documents are available by emailing
Jim McGlade or may be picked up at BHDP Architecture Raleigh
office.
The Work of this project will consist of, but not be limited
to, the renovation of approximately 10,500 sf existing shell
space on the first floor of Murray Hall. The program will
primarily be comprised of the following areas; Applied
Physical Science research laboratories and support spaces,
offices, conference room, lounge/coffee bar area, student
workrooms, wood working, metal working, electronics, digital
fabrication, classroom, and circulation. The Work will
include demolition, interior finishes, HVAC, plumbing,
electrical, fire alarm, and sprinkler. | |