Opportunities to Do Business with the Universities

Construction Solicitations to Prequalify Contractors

Full Details

 Institution NC State University 
 Institution URL for Additional
Information about this Project (Optional)
 http://www.ncsu.edu/facilities/advertisements/index.htm 
 Project Name Steam Phase 8  
 Prequalifying for 
NC State University is seeking qualification statements from general contractors for the Steam Phase 8 project. The scope of work will consist of the demolition of between 400-650 LF of LP and HP steam and condensate pipe and associated asbestos insulation and reinstallation of new HP steam and condensate pipe and insulation in a steam tunnel on central campus. The University is seeking qualification statements from general contractors who have experience in steam and condensate piping construction. Construction is anticipated to start in mid-June 2013 and continue through the end of October, 2013. For a more detailed explanation of the project, go to the URL address identified above.
 
 Main Contact for Submission Campus Contact 
 Name of Design Firm RMF Engineering 
 Design Firm Contact Name Jonathan Newton 
 Design Firm Telephone Number (919) 941-9876 
 Design Firm Email Jonathan.newton@rmf.com 
 CM at Risk Firm Name Not Applicable 
 CM at Risk Firm Email Not Applicable 
 Campus Contact Email srbostia@ncsu.edu 
 Due Date 03/04/2013 
 Due Time 5:00 pm 
 Submit To 
Steven R. Bostian, PE NC State University Capital Project Management Administrative Services III Suite 331 2701 Sullivan Drive Raleigh, NC 27695-7520 Pre-qualification packages can be requested from Steve Bostian via email. Submittals can be delivered in person or by courier. If the submittal is delivered by courier, then please send to the street address. Two copies of the pre-qualification package are required. No electronic copies will be accepted.