Construction Solicitations to Prequalify Contractors
Full Details
Institution | Appalachian State University | |||
Institution URL for Additional Information about this Project (Optional) | http://construction.appstate.edu/sites/construction.appstate.edu/files/PrequalFormSectionSteamTunnel.pdf | |||
Project Name | Steam Tunnel and Manhole Repairs at Pedestrian Bridge Project | |||
Prequalifying for | The construction and installation of a new section of steam
tunnel on the campus of Appalachian State University. Scope
of work includes installation of: approximately 110 LF of
new 5'x4' steam tunnel consisting of a
cast-in-place bottom slab and a precast top, 1 vault and 1
vault extension, high pressure steam and pumped condensate
piping, temporary steam and condensate piping, vault drain
piping, tunnel ventilation piping and fan, and above grade
steam supports. Site demolition, restoration, and temporary
traffic control is required. | |||
Main Contact for Submission | Design Firm | |||
Name of Design Firm | RMF Engineering Inc., | |||
Design Firm Contact Name | Cheryl Piner, | |||
Design Firm Telephone Number | (919) 941-9876 | |||
Design Firm Email | cheryl.piner@rmf.com | |||
CM at Risk Firm Name | N/A | |||
CM at Risk Firm Email | N/A | |||
Campus Contact Email | piercewj@appstate.edu | |||
Due Date | 12/14/2012 | |||
Due Time | 3:00 pm | |||
Submit To | RMF ENGINEERING, INC.
(ATTN: CHERYL PINER)
8081 ARCO CORPORATE DRIVE
RALEIGH, NC 27617 |