Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | http://www.ncsu.edu/facilities/advertisements/index.htm | |||
Project Name | Cates Avenue Chilled Water Trunk Main | |||
Prequalifying for | North Carolina State University is seeking qualification
statements from general contractors for the Cates Avenue
Chilled Water Trunk Main Project. The scope of work will
consist of the installation of approximately 1800 LF of new
underground chilled water supply and chilled water return
piping from a connection at the Cates Utility Plant,
continuing down Cates Avenue to a connection in Cates Avenue
near the Talley Student Center, and also branching off to a
second connection at valves located between Owen Hall and
Turlington Hall. The scope includes associated valves and
fittings for the chilled water lines. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | United Engineering Group | |||
Design Firm Contact Name | Mitch Brown | |||
Design Firm Telephone Number | (919) 851-3902 Ext: 17 | |||
Design Firm Email | Mbrown@unitedeg.com | |||
CM at Risk Firm Name | Not Applicable | |||
CM at Risk Firm Email | Not Applicable | |||
Campus Contact Email | srbostia@ncsu.edu | |||
Due Date | 12/13/2012 | |||
Due Time | 5:00 pm | |||
Submit To | Steven R. Bostian, PE
NC State University
Capital Project Management Dept.
2701 Sullivan Drive
Suite 331
Raleigh, NC 27695-7520
Phone 919-515-8059
Please submit 2 hard copies to the Project Manager at the
above address. No electronic files will be accepted.
Pre-qualification packages will not be accepted after the
due date and time.
Pre-qualification packages can be requested on or after
November 26, 2012 from the Project Manager. Please request a
pre-qualification package by emailing the Project Manager. |