Opportunities to Do Business with the Universities

Designer Solicitations

Full Details

 Institution East Carolina University 
 Institution URL for Additional
Information about this Project (Optional)
  
 Project Name Health Science Campus Central Utility Plant Chiller #1 Replacement 
 Type of Services Engineering 
 Project Manager James Perron 
 Phone Number (252) 328-6858 
 Contact Email perronj17@ecu.edu 
 Closing Date 10/10/2017 
 Project Budget 
$1,000,000
 
 Project Description One-Two Sentences
This project consists of the installation of a chiller and system piping on the Health Science Campus Central Utility Plant at East Carolina University. The chilled water and condenser water is to be extended from the existing system pipe headers to the chiller equipment. The Variable Frequency Drives (2), the condenser water pump and the chilled water pump will be Owner supplied equipment and installed by the contractor. The electrical service for the chiller, pumps and VFD is to be extended from the existing electrical distribution system. The chiller control and sequence of operation is to be integrated with the existing Chiller Plant Trane Tracer Building automation system.
 
 Submit Letters of Interest
and Current SF-330 to:
 (Contact Person, Name of Institution & Address)
James Perron, PE East Carolina University Facilities Engineering & Architectural Services 1001 East. Fourth Street Greenville, North Carolina 27858
 

In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.