Designer Solicitations
Full Details
Institution | NC State University | |||||
Institution URL for Additional Information about this Project (Optional) | http://facilities.ofa.ncsu.edu/category/ads/ | |||||
Project Name | Centennial Campus Extension of Initiative Way | |||||
Type of Services | Engineering | |||||
Project Manager | Steven R. Bostian | |||||
Phone Number | (919) 515-8059 | |||||
Contact Email | srbostia@ncsu.edu | |||||
Closing Date | 09/03/2015 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences The project includes pavement, curb and gutter, site
lighting and landscaping for Initiative Way and Blair Drive.
The project will install approximately 1500 Linear Feet of
new, two lane asphalt pavement with concrete curb and gutter
from the current end point of Initiative Way at the Oval
Drive Storage Lots south to the intersection of Blair Drive
and Initiative Way. The project will also include the
extension of approximately 328 Linear Feet of two lane road
with curb and gutter of Blair Drive east to connect with
Centennial Parkway. The project will include a bridge in the
Blair Drive extension to preserve a perennial stream on the
northeast side of Centennial Campus
Current project authority is for advanced planning only.
The selected firm may be retained through full design and
construction at the University's option | |||||
Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Steven R. Bostian, PE
NC State University
Capital Project Management
Administrative Services III Building
2701 Sullivan Drive
Raleigh, NC 28695
A pre-submittal meeting will be conducted on August 18, 2015
at 10 AM in Admin Services III Conference Room 301.
Attendance is encouraged but not mandatory.
Please see the NCSU webpage listed above for further
information. |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.