Opportunities to Do Business with the Universities

Designer Solicitations

Full Details

 Institution UNC Greensboro 
 Institution URL for Additional
Information about this Project (Optional)
 http://facdc.uncg.edu/roofs/ 
 Project Name Roof Replacement: Ferguson, Financial Aid, University Graphics & Printing 
 Type of Services Architectural/Engineering 
 Project Manager Matt Takacs 
 Phone Number (336) 334-5269 
 Contact Email m_takacs@uncg.edu 
 Closing Date 09/27/2013 
 Project Budget 
$1,067,000
 
 Project Description One-Two Sentences
The scope of this project is to replace the roofs of three buildings on campus; Ferguson Building, Financial Aid Building and University Graphics and Printing (Subject to all necessary approvals). The Ferguson Building roof replacement includes the removal of an existing 21,000 SF built-up roof, flashings, and tapered board insulation. The new project will install lightweight insulating cellular concrete, perimeter blocking, and a 2-ply modified bitumen roof system with granular cap sheet. Included in the project will be new flashings, joint sealants, roof hatch and skylight. The Financial Aid roof replacement includes the removal of an existing 6,500 SF 3-ply roofing system. The project will install a new cover board, tapered insulation, and a 2-ply modified bitumen roof system with a granular cap sheet. Included in the project is a new metal soffit and parapet extension, flashings and joint sealants. The University Graphics and Printing roof replacement includes the removal of an existing 5,800 SF built-up roof and flashings. The new project will install tapered insulation, cover board, perimeter blocking and a 2-ply modified bitumen roof system with granular cap sheet. Included in the project will be new flashings, joint sealants and the repair of an exterior canopy. Responses should be no more than 30 sheets of paper (double sided), excluding SF 330 form. Submit two (2) copies of the response in the following format: Tab 1: Completed Information Sheet; Tab 2: Letter of Interest (Cover Letter); Tab 3: Project Team Organization Chart (Identify members and work scope); Tab 4: Similar Project Experience (primary designer and consultants); Tab 5: Energy Conservation/LEED Experience (primary designer and consultants); Tab 6: Minority Business Participation Plan; Tab 7: Current SF 330. On your completed Information Sheet, PLEASE INCLUDE A PRIMARY CONTACT PERSON'S NAME AND EMAIL ADDRESS which will be used by the University for all future communications.
 
 Submit Letters of Interest
and Current SF-330 to:
 (Contact Person, Name of Institution & Address)
Matt Takacs Facilities Design & Construction UNC Greensboro Gray Home Management House 105 Gray Drive Greensboro, NC 27412
 

In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.