Construction Manager-at-Risk Solicitations
Full Details
Institution | UNC Charlotte | |||||
Institution URL for Additional Information about this Project (Optional) | http://facilities.uncc.edu/advertisements | |||||
Project Name | Outdoor Events Shelter | |||||
Project Manager | Donia Schauble | |||||
Phone Number | (704) 687-0520 | |||||
Contact Email | dschauble@uncc.edu | |||||
Pre-proposal Date | 12/09/2014 | |||||
Pre-proposal Time | 2:00 pm | |||||
Pre-proposal Location | Cone Room 208 | |||||
Closing Date | 12/18/2014 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences The project includes the construction of an 8,000 square
foot pre-engineered Outdoor Events Shelter and adjacent
pre-engineered restroom building with brick cladding. The
intended use of the shelter is for special event
accommodation, primarily for football game day tailgating
events. The events shelter shall be an unobstructed open
pavilion with a concrete floor. The restroom building shall
be a pre-engineered restroom building with applied brick
cladding. Installation of the two (2) buildings on the
selected site will require the use of retaining walls on
portions of both the pavilion structure and the restroom
building. A paved pull-off area for delivery vehicles will
also need to be provided. Please note the project must be
completed and ready for use by mid-August 2015. The tight
project timeline will require the CM and design team to
develop a precise project delivery strategy.
Project authorization is pending Board of Governors action. | |||||
Submit To | Joyce Clay
University of North Carolina at Charlotte
Facilities Management - Capital Projects
9201 University City Boulevard
Charlotte, NC 28223-0001
or Hand Deliver to
Attn: Joyce Clay
Facilities Management/Police Building
2nd Floor - Capital Projects
9151 Cameron Blvd (Building #55 on the campus map) |